ZELINSKY: Photos for Week 10/2/07
 

 

 

The first deck windows pulled out for r

 

 

 

 

Second deck overhead prior to blasting.

 

 

 

 

Second deck overhead half blasted.

 

 

 

 

Bow interior prepped for blasting.

 

 

Repair Photo: Week 8/6/07
Repair Photo: Week 8/20/07
Repair Photo: Week 9/11/07
Repair Photo: Week 10/2/07
Repair Photo 5