ZELINSKY: Port Side Hull  
 

Here the vessel is in dry-dock and shows algae growth at the water-line and rub-rail on the port side.  The entire hull will be pressure washed, sanded, primed and painted. Areas with significant pitting will be cut-out and replaced with new aluminum.

 
 

 

Return to Week 8/6/07